2021-2022 Ford Otosan New Paintshop Plant Cataphoresis Piping
The piping systems for the PT & EC lines at the Ford Otosan Yeniköy Paint shop installation project were manufactured and installed, involving the fabrication of 40 tons of stainless-steel pipes and fittings, with a total of 35,000 inches of welding. The project was subcontracted to Dürr/Germany, the global leader in paint shop installations. The performance was rated exceptional by Dürr. The project started in November 2021 and was completed in September.